
Indian Space Research Organisation (ISRO) begins meeting of Human-Rated Launch Vehicle Mark-3 for the primary Gaganyaan uncrewed flight on the Satish Dhawan Space Centre in Sriharikota on December 18, 2025.
| Photo Credit: ISRO/ANI
While the Indian Space Research Organisation (ISRO) has not come out with any agency dates as to when it plans to accomplish the launches it was scheduled to undertake this 12 months which incorporates the primary uncrewed mission of Gaganyaan (G1), April noticed the house company executing the second Integrated Air Drop Test (IADT-02) for the mission.
During the IADT-02 performed at Satish Dhawan Space Centre, Sriharikota a simulated Crew Module, weighing about 5.7 tonnes, that’s equal to the mass of the Crew Module in the primary uncrewed Gaganyaan mission (G1), was lifted by an Indian Air Force Chinook helicopter to an altitude of about 3 km and launched over a delegated drop zone in sea, close to to Sriharikota coast. The profitable conduct of this take a look at is a big step in the direction of the readiness for the G1 mission.
Staying on with Gaganyaan in one other nook of the nation at altitude of round 3,500 metres above sea stage the 4 Indian astronauts chosen for the mission together with scientists, engineers and medical groups have been subjected to a weeklong behavioral examine.
Published – May 01, 2026 08:05 am IST


